Non-domestic. England, Wales and Scotland

What does a commercial heat pump cost?

£3,386.29 median of 10 providers' published prices for e-commerce seller, £899 to £8,673.48, read 11 November 2026. Commercial Heat Pump Price Index

Get commercial heat pump quotes

The building

What sort of building is it?

  • Free, no obligation
  • Your details go to at most three installers
  • Takes about two minutes

Leave your email and we'll get straight back to you.

  1. We email you the questions a firm needs answered, straight away.
  2. You answer them by reply, or on this site.
45kWth
maximum capacity for a BUS grant on an individual system, or 70kWth where a heat pump is installed with one or more additional heat pumps
gov.uk Boiler Upgrade Scheme
No PD class
Part 14 of the GPDO gives permitted development for ground and water source heat pumps on non-domestic premises, but has no class for air source
GPDO 2015, Schedule 2 Part 14
What 10 providers publish Commercial Heat Pump Price Index
Lowest
£899
Median
£3,386.29
Highest
£8,673.48

11 prices published for e-commerce seller, read . Every price, with its source

What sets the price of a commercial heat pump installation, 2026

We publish no price per kW: a commercial heat pump is a whole-system project. Heat load, emitters, plant space, acoustics and power supply move the cost more than the pump. Most commercial schemes exceed the Boiler Upgrade Scheme's 45kWth cap.

Cost driverWhy it moves the priceWhat to ask the installer
Heat load and building fabricThe heat pump is sized to the calculated loss of the building, not to the rating of the boiler it replaces. Boilers are routinely oversized, so sizing from the old plate specifies plant you do not need and cannot afford to run. Fabric improvements can cut the plant size and the bill with itWhether the quote is based on a room-by-room or building heat loss calculation, and what design external temperature was used
Flow temperature and the emittersThis is usually the largest variable after the load. A heat pump is most efficient at a lower flow temperature than a boiler system was designed around, so radiators and coils sized for high flow temperatures have to be uprated or replaced. In fan coil and air handling buildings the coil capacity at the new flow temperature has to be checked unit by unitWhat flow temperature the design assumes, and which emitters are being retained, uprated or replaced at that temperature
Pipework and hydraulicsLower flow temperatures mean higher flow rates for the same output, so existing distribution pipework, valves and pumps may be undersized. Buffer vessels, low loss headers, volumisers and additional pumping are common additions that never appear on a headline kW priceWhether the existing distribution has been checked for flow rate and pressure drop, and what hydraulic separation is included
Plant space and structural supportExternal units need space with clear airflow, access for maintenance and a base or steelwork that can carry them. Roof plant can need structural checks and craneage. Ground source moves the cost into boreholes or ground loops and the land to put them inWhere the plant is going, what structural or craneage allowance is in the price, and who is responsible for the base
AcousticsAir source plant is assessed for noise at the nearest sensitive receptor, and attenuation, acoustic enclosures, screening or a different location can all follow. Acoustic constraints are a common reason a scheme is redesigned after the first quoteWhether a noise assessment is included, and what it assumes about background level and the nearest window
Electrical supply capacityHeat pumps move the load from gas to electricity. If the incoming supply cannot carry the new load, the distribution network operator quotes the upgrade separately, with its own charges and its own programme, and that quote can dominate both the budget and the timescaleWhat electrical load the plant adds, whether the existing supply and switchgear carry it, and whether a network operator application is assumed
Planning and permitted developmentPart 14 of the GPDO gives permitted development rights for ground source (Class L) and water source (Class M) heat pumps on non-domestic premises, but contains no equivalent class for air source heat pumps on non-domestic premises. Other rights can apply, for example plant on industrial land under Part 7 Class I, which is not permitted where it would materially affect the external appearance of the premises or exceed 15 metres. Listed buildings and conservation areas add their own consentsWho is making the planning application, what the fee and programme allowance is, and whether the design assumes a permitted development right
Refrigerant and F gas dutiesOnce installed, the operator carries duties. gov.uk makes users of stationary heat pumps responsible for leak checking, at least every 12 months where the charge is 5 to under 50 tonnes of CO2 equivalent, every 6 months from 50 to under 500, and every 3 months above that, with automatic leak detection required on the largest systems. Contractors servicing your equipment must hold company certification and individual qualificationsThe refrigerant, its charge in tonnes of CO2 equivalent, the resulting leak check interval, and whether the maintenance quote includes those checks and the records
Controls, commissioning and integrationA heat pump only delivers its design performance if the controls run it that way. Weather compensation, sequencing across multiple units, integration with an existing building management system and proper commissioning are where retrofit performance is won or lost, and where a cheap quote usually saves its moneyWhat is included for controls, BMS integration, commissioning and the first year of seasonal performance monitoring
Grant positionThe Boiler Upgrade Scheme runs in England and Wales and gov.uk states you can use it to replace a heating system in a building used for your business, at £7,500 for an air source or ground source heat pump, one grant per property. The capacity caps are the catch: 45kWth for individual systems, 70kWth where a heat pump is installed with one or more additional heat pumps, and 300kWth for shared ground loops. It cannot be used for hybrid systems, most new builds or social housingWhether the scheme applies at your capacity, whether the installer is MCS certified, and whether the grant is shown net in the price
Commercial Heat Pump Price Index: every published price, with its source
How these figures were put together

A commercial heat pump does not price like a boiler swap. The number comes from the building: what the fabric loses, the emitter temperature, where the units go and how loud they may be. It also turns on whether the supply can carry them. This table gives each driver, its effect on the quote and the question that compares quotes.

This is a cost-driver table rather than a price list, and that is deliberate. Commercial heat pump projects vary by an order of magnitude for the same nominal kW output depending on emitters, plant space and electrical capacity, so any published average would mislead the reader who most needs the answer. No installed price is quoted here because we cannot evidence one across the range of buildings this covers. The grant, capacity, planning and F gas rows are taken from gov.uk and legislation.gov.uk and were read on the updated date above; the remaining rows describe how commercial heating projects are scoped and are not sourced figures. Prices for your own building come from the installers, through the form above.

How it works

  1. First

    Tell us about the building, the emitters and the supply. Two minutes, no account.

  2. Next

    We pass your details to commercial renewable energy and heating firms covering your postcode, and to no one else.

  3. Then

    They come back with a survey and a price for your building. Compare, choose, or walk away.

Commercial Heat Pump Cost is a free introduction service; we pass your details to commercial renewable energy and heating firms who quote you directly. We may receive a fee from providers; you pay nothing and are under no obligation. We are not installers, engineers or planning consultants, and nothing here is design, planning or legal advice. We publish no installed price because we cannot evidence one across the range of buildings this covers, and grant, planning and F gas rules change, so confirm the current position with the sources listed before you rely on it.

Sources

This site's own datasets, every figure quoted from its source and dated:

  • The Certified Installer Register carries 2 published figures read from 2 sources' own pages, from 2,215 to 10,000 count, read 11 November 2026.
  • For e-commerce seller, the median published figure in the Commercial Heat Pump Price Index is 3,386.28 GBP across 10 figures from the sources' own pages (range 899 to 8,673.48 GBP), read 11 November 2026.
  • The Heat Pump Grant and Statutory Terms carries 6 published figures read from 4 sources' own pages, from 0.01 to 10,000 GBP, read 7 November 2026.
  • The Non Domestic Energy Price Series carries 3 published figures read from 2 sources' own pages, from 5.52 to 25.97 pence, read 11 November 2026.
  1. gov.uk, apply for the Boiler Upgrade Scheme
  2. gov.uk, Boiler Upgrade Scheme: what you can get
  3. gov.uk, Boiler Upgrade Scheme: check if you are eligible
  4. General Permitted Development Order 2015, Schedule 2 Part 14 (microgeneration)
  5. General Permitted Development Order 2015, Schedule 2 Part 7 (industrial and warehouse)
  6. gov.uk, checking F gas equipment for leaks
  7. gov.uk, qualifications to work with F gas
  8. gov.uk, company certification to work with F gas
  9. MCS, find an installer
Get heat pump quotes