Questions answered

What actually sets the price of a commercial heat pump installation, and free quotes from commercial heat pump installers.

Get commercial heat pump quotes

Questions, answered directly

How much does a commercial heat pump cost?

There is no honest price per kW. The cost is set by the heat load and whether emitters and pipework must change for a lower flow temperature. Plant space, acoustics and supply capacity also move it. Two buildings of the same nominal output can be an order of magnitude apart. So this site publishes cost drivers and real quotes.

What does a commercial air source heat pump cost?

For the unit alone, 10 of 102 suppliers and manufacturers read on 11 October 2026 publish a price: median £3,386, £899 to £28,500 (Kensa's commercial ground source unit). These are equipment prices, mostly small air source units sold online. Design, installation, emitters and electrical upgrades are extra, and mostly decide the cost of heat pumps in commercial buildings.(Commercial Heat Pump Price Index)

How do I get commercial heat pump quotes?

Give every installer the same facts: the building type and floor area, how it is heated now, the emitters and the electrical supply. The form on this page asks for each of those, so the heat pump quotes you get back price the same job.

Is a heat pump retrofit just a boiler swap?

No. A heat pump runs at a lower flow temperature than the system was designed around, so emitters, pipework flow rates, hydraulic separation and controls all have to be assessed. A quote that prices only the plant and leaves the distribution system alone is usually the most expensive one on the table by the second winter.

Does the Boiler Upgrade Scheme apply to commercial buildings?

In England and Wales, gov.uk states the grant can replace a heating system in a building used for your business. It is £7,500 for an air source or ground source heat pump, one grant per property. The caps of 45kWth for individual systems and 70kWth with additional heat pumps exclude most larger commercial projects.

Do I need planning permission for a commercial heat pump?

Very possibly. Part 14 of the England GPDO gives non-domestic permitted development rights for ground source (Class L) and water source (Class M) heat pumps, but none for air source. Other rights such as Part 7 Class I for plant on industrial land may apply. Confirm the current position with the local planning authority.

Will the electricity supply need upgrading?

Often. Heat pumps shift load from gas to electricity. If the incoming supply or switchgear cannot carry it, the distribution network operator quotes the upgrade separately under its own connection charging methodology. That quote can set both the budget and the programme, so it belongs in the feasibility stage rather than at order.

Does the installer have to be MCS certified?

For a Boiler Upgrade Scheme grant, yes: gov.uk directs applicants to an MCS certified installer and the scheme is administered on that basis. MCS covers small-scale renewable installations, so a larger commercial scheme outside the grant is normally procured on the strength of the design, references and commissioning evidence instead.

Get heat pump quotes